Friday, November 28, 2014

LINK Up!! Stage 2.

So the loom is done for the Link, and ive got a dizzy to suit.
With 24/1 tooth rotors inside.




So this My wiring diagram i used.
Took a bit to figure out what goes where.
But after all that, im still failing to get spark..

So not running yet. :(

1 comment: